Existing roof drains are to be cleaned and maintained free of debris during re roofing.
General notes for demolition plan 101.
Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
Existing roof drain systems are to remain fully operational functional during the re roofing and design build contractor is responsible for providing temporary protection during demolition and renovation activities.
Roof plan general notes a the replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety.
General demolition notes 1.
Information contained here is a result of limited field verification.
12 13 14 interior finishes shall be class c surface flame spread rating of 76 200.
Contractor shall field verify all existing conditions including the locations of structural mechanical electrical piping and conduit prior to proceeding with the demolition work.
At the removed fasteners in all existing masonry walls and floors patch hole with grout level with existing adjacent substrates in order to receive new finishes.
The demolition drawings have been developed from.
Where existing finish surface is to remain repair patch all locations associated with demolition removal of adjacent finishes framing fasteners etc.
Two demolition workers die of burns after flash fire at warehouse.
General notes roof plan 1.
See structural drawings for top of steel t o s at all proposed roofs.
General notes new construction on sheet a200 102.
General notes for project on project information sheet g001 b.
General demolition notes 1.
949 768 7048 owner operated provides you with reliable roofing tear down demolition and professional work.
However the hazards of demolition work can be controlled and eliminated with the proper planning the right personal protective equipment necessary training and compliance with osha standards.
Employee in aerial lift killed when roof collapses.
The peak of reliable roof demolition company.
No trench overcuts allowed at finished slab areas.